Resin

Epoxy countertops and bar tops

A surface, not a casting. Everything about the job follows from the fact that a coating epoxy goes on an eighth of an inch at a time.

Short answer

A coating epoxy is poured at about 1/8 in per flood coat, so a 10 ft kitchen counter takes roughly 6.8 litres for one coat plus wastage. Seal the substrate with a thin coat first to stop it outgassing bubbles into the flood coat, then pour the flood coat and let it self-level. Build depth with additional coats rather than one thick pour — going deeper in one go is a heat hazard rather than a slow cure.

A countertop is the clearest example of the difference between coating and casting. The resin is a surface here — a film a couple of millimetres thick over whatever is underneath — and everything about the job follows from that. Table top / coating epoxy goes on at 1/8 in per flood coat, sets hard in 72 hours, and self-levels well enough that a brush mark disappears while you watch.

The arithmetic is pure geometry and it is worth doing rather than guessing. A 21 square foot counter takes 6.8 litres for one flood coat including 10% wastage — 1.79 gal, or about $107 of resin. One US gallon covers 12.8 square feet at that depth; you will see 12 printed on tins, and the difference is about 6% of waste allowance already folded in.

What people underestimate is the preparation, not the pour. A porous substrate — bare wood, MDF, old laminate with a chip in it — releases air into the resin for hours, and the flood coat is where that air ends up. The seal coat is the whole difference between a glassy counter and one with a constellation of bubbles frozen into it. If you have not poured resin before, the beginner's guide covers the mixing this page assumes.

One flood coat, by size

Surface
Area
Per coat
In gallons
Materials
Small vanity A bathroom top. One mixing bucket, one coat, one evening.
7.2 sq ft
2.3 litres
0.62 gal
$37
Kitchen island Wider than a counter, so the middle is further from every edge — level it carefully.
17.7 sq ft
5.8 litres
1.52 gal
$91
Kitchen counter, 10 ft The standard 25 in depth. Long and narrow, which is the easy shape to flood.
20.8 sq ft
6.8 litres
1.79 gal
$107
Bar top, 8 ft Usually two coats rather than one, because a bar top gets looked at from close up.
16.0 sq ft
5.2 litres
1.37 gal
$82

Every row is 1/8 in deep, because that is what a coating epoxy pours at — only the area changes. Volumes include 10% wastage, and the cost is materials at $60 a gallon. A second coat doubles the resin and does not double the depth of the first.

The three coats, and what each one is for

A skim
Seal coat — thin, brushed, sacrificial

Not about thickness. A thin coat brushed or squeegeed into the surface fills the pores and stops the substrate outgassing into the pour that matters. It will look patchy and imperfect and that is fine — nobody sees it. Skipping it is the commonest cause of a bubbly counter, and the one thing you cannot fix afterwards.

1/8 in
Flood coat — the one that matters

Poured on and left to find its own level, which it does well. Spread it roughly with a squeegee to get it near the edges, then stop touching it — self-levelling works better than you do. 6.8 litres on a 21 sq ft counter, and the 20–40 minutes of working time is the clock you are on.

+6.8 litres
Second coat, if you want one

A bar top is looked at from a foot away, so many get two. The second doubles the resin and does not double the depth of the first — and it wants to go on inside the recoat window, while the first is still tacky, or it needs a light sand to bond. The pour depth guide covers the timing.

What decides how it comes out

1
It is a coating, so depth is not the lever

Every flood coat is 1/8 in whatever the surface. Pouring thicker to save a coat is the mistake this whole craft's safety page is about: the reaction is exothermic, the heat accelerates it, and a coating epoxy in a deep mass cracks and smokes. If you genuinely need thickness, that is deep pour / casting epoxy and a different job.

2
Outgassing from the substrate

Wood, MDF, concrete and chipped laminate are all porous, and warm resin sitting on them draws air out for hours. The bubbles appear an hour into the cure, long after you have stopped watching. A seal coat closes the pores; so does warming the substrate slightly before the flood coat, so it is cooling rather than warming while the resin sits on it.

3
The edges, which is where the resin goes

A self-levelling resin runs off every edge it can reach, and on a counter that is a lot of edge. Tape the underside of the overhang so the drips form a clean line you can trim rather than a fringe you have to sand, and put something disposable underneath — the runoff is real volume, and it is part of why the wastage allowance exists.

4
Level, and the room being level too

Resin finds the horizon, not the counter. A cabinet run that is 2 mm out casts a top that is 2 mm thicker at one end, and on a counter that shows as a visible pool. Shim and check with a long level before the seal coat, not after — once the flood coat is on, the only fix is more resin.

5
Temperature and the dust in the room

Around 21–24 °C is the working window. Cold resin holds bubbles and stays thick; warm resin sets before it has levelled. And a counter is a very large horizontal surface staying tacky for hours, so anything airborne lands in it — do not sand, sweep or run a fan in the room the day you pour.

6
Kitchens raise a question this page does not answer

Whether you can prepare food on it is a separate matter with a careful answer, and it is not a property of epoxy in general. The food safe guide covers what a manufacturer's claim actually means, what full cure has to do with it, and why a cutting surface is a different question from a counter.

Doing one

Work out the volume before you buy anything

Area times 1/8 in, plus wastage, plus the runoff. The bar top flood coat, 8 ft on the table is 5.2 litres; a 21 sq ft counter is 6.8 litres. The calculator has presets for both and takes your own dimensions.

Seal coat the day before

Brush a thin coat over everything the flood coat will touch, including the edges and any exposed end grain, and let it set. It takes half an hour and it is the difference between a clear top and a bubbly one.

Mix in batches, not in one bucket

6.8 litres of fast resin in a single container is a deep pour in its own right and can exotherm before it reaches the counter. Mix in wide vessels a few litres at a time, pour each one out immediately, and have the next one going while you spread.

Spread roughly, then leave it alone

Get it near the edges with a squeegee or a gloved hand and stop. Every additional pass adds air and disturbs a surface that is already levelling itself better than you can. Then torch the bubbles in one sweeping pass and cover it.

Tape the underside of the overhang

Resin will run around a square edge and set into a fringe of drips that has to be sanded off later. Tape a few millimetres below the edge and the runoff forms a clean line that peels away once cured.

Do not put anything on it for a week

Hard to the touch at 24 hours and fully cured at 72. Chemical resistance and hardness both arrive at full cure, not before — a mug set down on day two leaves a ring that is permanent.

Size your own top

Pick the countertop or bar top preset, put in your own length and width, and the calculator gives the volume per coat, the resin and hardener split and the cost at your own kit price.

Open the epoxy calculator →

Estimates, not advice. Every figure on this page is computed from published reference values and standard measures, so your own inputs, equipment and conditions will move it. Nothing here is professional advice — talk to a qualified professional before acting on it.

Frequently Asked Questions

More on epoxy countertops and bar tops

How much epoxy do I need for a countertop?

Area times the coat depth. A 21 square foot counter takes about 6.8 litres — 1.79 gal — for one flood coat at 1/8 in, including 10% wastage. Add a second coat and you double it. The calculator has a countertop preset.

How many square feet does a gallon of epoxy cover?

12.8 square feet at 1/8 in, which is pure geometry. Tins commonly print 12, and the 6% difference is a waste allowance already folded into their figure. Coverage halves every time you double the depth, so any coverage number quoted without a depth means nothing.

What is bar top epoxy?

The glossy coating one. Built to be poured thin over a surface and self-level into a hard, clear film — bar tops, counters, artwork, tumblers. It is fast, and the speed is the point: a coat is dust-free in a few hours instead of a few days. It is the same product as table top epoxy — the names are used interchangeably — and it is a coating rather than a casting resin. 1/8 in per coat, 1:1 mix, hard in 72 hours.

How many coats of epoxy on a countertop?

A seal coat plus one flood coat is the standard, and a lot of bar tops get a second flood coat because they are looked at from close range. What you do not do is pour one thick coat instead of two thin ones — that is the exotherm problem, not a shortcut.

Do I need a seal coat?

On anything porous, yes, and almost every substrate is. Wood, MDF and concrete all release air into warm resin for hours, and the bubbles surface into the flood coat an hour after you stop watching. A thin brushed coat the day before closes the pores and it is the single highest-value half hour in the job.

Why does my epoxy countertop have bubbles?

Either the substrate outgassed, which is the seal coat, or the mix picked up air, which is stirring too fast. Both are dealt with before the pour rather than after. A torch sweep gets the surface bubbles out in the first twenty minutes, but it cannot reach the ones arriving later from the wood.

Is an epoxy countertop food safe?

A separate question with a careful answer, and not a property of epoxy in general — it is a claim a manufacturer makes about their own system under a stated cure. The food safe guide covers what that claim covers, why full cure matters, and why cutting on the surface is a different question from setting a plate on it.

How long before I can use the counter?

24 hours before it is hard enough to touch and 72 hours to full cure. Hardness and chemical resistance both arrive at full cure — anything set down before that leaves a permanent mark, and hot pans are a bad idea at any point.

Can I put a hot pan on it?

No. Craft epoxies soften somewhere between 50 and 80 °C, well below a pan straight off a hob, and the mark is permanent. Trivets on an epoxy counter are not optional in the way they are on stone.